Fiorenzato Colombina: Planning for PID
-
- Posts: 2
- Joined: 2 years ago
Evening all,
I'm wondering if someone could please look over my PID install plan for my 2017 Fiorenzato Colombina (0.85 litre single boiler, AKA: Vitudurum V2) and double check for any obvious issues. I haven't done a PID install before, but I have stripped and rebuilt a few Gaggia Classics and Rancilio Silvias over the years.
Renders (not to scale):
3d models (navigate with scroll wheel, left and right mouse):
Questions:
Kind regards,
Romeowns (New Zealand)
I'm wondering if someone could please look over my PID install plan for my 2017 Fiorenzato Colombina (0.85 litre single boiler, AKA: Vitudurum V2) and double check for any obvious issues. I haven't done a PID install before, but I have stripped and rebuilt a few Gaggia Classics and Rancilio Silvias over the years.
Renders (not to scale):
- Factory wiring
- Modified wiring
- PID wiring (XMT-7100)
- Additional image 1 (front)
- Additional image 2 (Gicar)
3d models (navigate with scroll wheel, left and right mouse):
Questions:
- Is 18AWG suitable purely for the PID itself (supply + control + earth)?
- Is 14AWG suitable for the SSR output circuit given the 1500w 240v boiler?
- Is the Fotek 40amp SSR preferable over the 25amp?
- Is tapping into the Indicator* lamp terminals a sound approach?
(Note: there is ample space around the lamp terminals, but not so much the main switch) - Is there any concern with the PID frequently cycling the heating element on this machine?
- Any other thoughts or feedback appreciated.
Kind regards,
Romeowns (New Zealand)
-
- Posts: 2
- Joined: 2 years ago
Here's my shopping list of parts:
Shopping list:
Apologies to the mods if this trips the spam filter, none of these are affiliate links.
Kind regards,
Romeowns (New Zealand)
Shopping list:
PID Controller:
XMT-7100
Aluminium Enclosure
SSR:
Fotek SSR-40DA
RTD Sensor:
PT100 3-Core with M4 thread, 2000mm length
(Existing = 110°C Thermostat with M4 thread + Faston 6.3x0.8 mm terminals)
Wire:
PID Supply + Control + Earth = Brown / Blue / Green 18AWG stranded 0.75mm core / 2.3mm OD (Silicone 200°c)
SSR Output (to boiler circuit) = Red 14AWG stranded 2mm core / 3.5mm OD (Silicone 200°c)
Terminals:
PID Supply = Insulated Faston 6.3mm spade piggy back
SSR = Insulated ring (internal diameter TBC)
SSR Output to boiler circuit = Insulated Faston 6.3mm spade
Miscellaneous:
Rubber Grommets = 8mm internal diameter, 10mm hole diameter, 17mm flange (250°c)
Sleeving = Expandable braided cable sleeve 8mm x 2m (125°c)
Apologies to the mods if this trips the spam filter, none of these are affiliate links.
Kind regards,
Romeowns (New Zealand)