Today was very productive. I picked my cabinet from the cabinet maker, my contractor came by and completed the cabinet install, moved an outlet that would have otherwise been covered my the cabinet, ran the circuit for the espresso machine, finished the hot and cold water supply and drain.
Tomorrow UPS says the sink will be delivered, once I cut the hole for the sink the granite fabricator will come by to measure and make the template. After the granite is set my contractor will come back do the tile backsplash. The only problem is the faucet I ordered is on back order so that may delay completion. But progress is being made.
Here's a picture I took this afternoon:

Still a work in progress.
jw