Tips for installing Astoria 2 grp SAE/2N?

Need help with equipment usage or want to share your latest discovery?
sindell1
Posts: 2
Joined: 12 years ago

#1: Post by sindell1 »

I have an Astoria SAE/2N that I uninstalled from a coffee shop last January and I'm about to re-install it in a different location.
Does anyone have any tips on what I should or shouldn't do?
The machine was in good working order when it left the shop and has been stored carefully.
My problem is the machine did not come with a manual (anyone know where I can download one?)
Jane

godlyone
Posts: 446
Joined: 15 years ago

#2: Post by godlyone »

If you are installing new water filters, make sure to flush them before hooking up the machine.

The astoria has 2 switch modes, pump only and full on (heater). it should also have a manual fill.

After connecting the water and power, (not on yet) fill the boiler at least part of the way, then click switch to first position, ensure the auto-fill works and fills to correct level

then when boiler is fully filled, turn switch to 2 to allow heater to warm up.

note that in position 1 you can test all of the buttons/keypads to ensure they all work... also inspect the area for leaks!

sindell1 (original poster)
Posts: 2
Joined: 12 years ago

#3: Post by sindell1 (original poster) »

Will do. Thank you.
Jane.